Bilger Run BR 39 nodes
Primary tabs
| Title | Content type | Status | Updated Sort ascending | Operations |
|---|---|---|---|---|
| Analysis Report, Bilger Run BR 39 | (2024-02-24) | Analysis Report | Published | ||
| Bilger BR 39 Schematic & O&M Plan | Downloads | Published | ||
| Bilger Final Report - 2008 | Downloads | Published | ||
| Bilger Site Plan - Design Drawings | Downloads | Published | ||
| PA285C | Sample Point | Published | ||
| PA285B | Sample Point | Published | ||
| Anoxic Limestone Drain (ALD) | Treatment Technologies | Published | ||
| Settling Pond | Treatment Technologies | Published | ||
| Analysis Report, Bilger Run BR 39 | (2022-02-18) | Analysis Report | Published | ||
| Bilger Run BR 39 / Analysis Report, Import 49 | Analysis Report | Published | ||
| Bilger Run | Watershed | Published | ||
| Bilger Run | Watershed | Published | ||
| Bilger Run | Watershed | Published | ||
| D1-411 | System ID | Published | ||
| PA-285 | System ID | Published | ||
| EPA Section 319 | Funding | Published |